⛏️ OreFactoryGuideWIKI ← Back to All Guides
Automation & Logistics

How to Fix Conveyor Belt Bottlenecks in Ore Factory Squad

By OreFactoryGuide Team Updated July 2026 5 Min Read

⚡ Quick Summary (TL;DR)

Conveyor bottlenecks usually happen when your raw mining drill speed exceeds your refinery's processing rate, or when un-split belts overflow into a single input. To fix it: Use a 1:4 Splitter Array, balance input belt tiers, and isolate limestone/copper waste lines.

Why Do Belts Jam in Ore Factory Squad?

As your mining drills upgrade, raw ore accumulates faster than standard Level 1 belts can move. When multiple drills feed into a single smelter, raw chunks pile up, triggering a factory-wide system lock.

Step-by-Step Belt Routing Layout

  1. Install a Balanced Splitter Node: Right at the drill output, place a 1-to-3 or 1-to-4 splitter instead of connecting belts directly to a single smelter.
  2. Match Furnace Input Rates: Each basic refinery handles ~15 ore/min. If your drill produces 60 ore/min, route exactly 4 separate lines out from the splitter node.
  3. Isolate Byproducts: Place a dedicated overflow merger at the back of your line for waste stones and unrefined gravel.

💡 Pro Tips to Prevent Future Bottlenecks

  • Always match belt speeds: Feeding a Tier 2 drill into a Tier 1 belt creates an immediate bottleneck.
  • Leave 2 grid spaces between smelter lines for future forklift logistics access.
  • Check truck loading docks frequently to ensure pallet mergers are not blocked by full storage containers.