Ore Factory Squad Oil Factory Layout: A Four-Zone Plan
Keep Tanker access to factory storage input, a conveyor to the Refinery, later processing and dispatch separate. Mining Lift piping is a deep-site option.
On this page
Oil & maintenance
- Bring / prerequisite
- A working small oil chain
- Check this UI first
- Factory storage input, output conveyor, Refinery and later processing
- Move on when
- The failed oil handoff can be reached without rebuilding the whole block.
An editorial layout; no current port position, pipe rate or universal capacity is established.
Quick answer
Use four zones: Tanker arrival and factory storage input, Oil Refinery, Oil Processor, and product handoff to existing lines. Keep the Tanker service path clear and keep each zone easy to inspect. v1.1.2 After Hours is the current release and adds an Oil Pipe connection to the Mining Lift for routing oil out of deep dig sites. It does not establish a direct connection to the factory intake or replace the Tanker. Test it separately before changing a working route. This is OreFactoryGuide's editorial starting plan for a tight factory, not an official or measured best layout.

The four zones
| Zone | Put here | Why it stays separate |
|---|---|---|
| 1. Arrival and storage | Tanker access to the existing storage input pipe connection; accessible deep-site Lift routing if used | lets you inspect the chosen oil intake before changing factory processing |
| 2. First processing | Oil Refinery | gives Fuel and Bitumen their own visible checkpoint |
| 3. Later processing | Oil Processor | keeps later product choices from blocking the first Crude Oil test |
| 4. Product handoff | routes back to existing production, storage, contracts, or sale systems | preserves room to decide a real destination for each product |
The division makes debugging easier because each handoff has a clear source and destination. It is not a promise about fixed belt direction, machine spacing, capacities, or output rate.
Build in this order
- Leave a practical approach for the Tanker before you place machines around it.
- Keep the existing factory storage input pipe connection reachable; do not plan around placing a separate giant Oil Tank. Connect the loaded Tanker, follow the displayed start prompt, and confirm transfer until the truck is empty.
- Leave a conveyor route from storage output to one Oil Refinery. Select Crude Oil, confirm small canisters reach the Refinery, then check Fuel or Bitumen output.
- Add the Oil Processor only for the next named product you actually need.
- Route that product into an existing line only after the local oil step is working.
This order avoids a common planning trap: packing every possible product into one enclosed room before any single oil handoff is proven.
Optional Mining Lift pipe entrance
The official v1.1.2 After Hours update allows Oil Pipes to connect to the Mining Lift. Use this for a deep digsite pipe route. The announcement does not identify it as a direct factory intake, so keep the Tanker-to-storage-input unloading path in the factory plan.
- Leave the Lift connection and its pipe run accessible for inspection.
- Test one connected oil route and watch the supplying reserve and receiving oil equipment before adding more branches.
- Keep the Tanker approach available until the downstream handoff you intend to use works in your save.
This is an additional routing option, not evidence that every oil layout can discard the Tanker or connect every machine directly. For Lift setup and access checks, use the Mining Lift guide. The historical v1.1.1 hotfix adjusted Tanker-to-Oil-Tank transfer timing; retest that handoff if you retain the Tanker route, rather than assuming an old timing observation is a layout rule.
When the factory feels too small
Shrink the ambition before you expand the footprint. Keep one product branch working, leave the vehicle and maintenance side accessible, and postpone later products that do not solve the current task. The official update adds a new factory size with four storage output sockets, but it does not make that upgrade the right next choice for every save. Choose it only when confirmed space or output access is the real blocker.

Choose the next specific fix
If the Tanker cannot unload, use the Tanker Truck and Oil Tank guide. If you are not sure which machine should receive the next material, use Oil Refinery and Oil Processor explained. If a product needs a next destination, open the oil products reference. For an existing generic plant layout, see the modular factory layout guide.
Sources
The official v1.1.2 After Hours announcement, released October 1, 2026, is the current-version source for the Mining Lift oil-pipe connection. The official Masters of Oil announcement is the historical feature source for the oil systems, reconnection to existing production lines, and factory-size expansion. The historical v1.1.1 hotfix documents the Tanker-to-Oil-Tank transfer-timing change. The Steam discussion Ore Factory Squad - Solo first playthrough feedback was used only to identify a player's oil-product space problem; it is not proof of a universal footprint or best layout. These announcements do not publish a universal oil layout, so the four-zone plan above is explicitly editorial.
For the factory handoff, the September storage input/output discussion identifies the existing input pipe connection and small-canister conveyor output. A September 6 storage report describes oil being unloaded into factory storage rather than a placed giant tank. These are historical player reports, not a current-build playtest or measured throughput.